Photo Gallery - Plant & Machinery:
Click on the thumbnails below for a larger view
800 Tonne Mobile Crane raising
Tower Crane.
Rock Crusher & Grader in operation.
Delivery of Deck Crossbeam for River Suir Bridge.
Section of 800 Tonne Mobile Crane.
D6 Dozer stripping topsoil.
Concrete Pump at S40 Bridge Deck pour.
Rock Breaking & Ripping at Cut 2 area - Adamstown.
elivery of Bridge Deck Support Beam - S26.
CAT Grader in operation.
Band Drain Installation - Newrath Area.
Excavation of Rock - Cut 2 area.
Micro-pile Drilling Rig - River Suir Bridge.